Stanfield Cutoff Restroom Site Preparations Project
Job Description: The project involves the site improvements and preparations for the eventual installation of a prefabricated restroom building. Work includes site preparation and grading, construction of the building foundation to manufacturer specifications, construction of utility connections, and construction of ADA walkways. Building to be placed and installed by others.
Fiscal Year 2022-23 Street Rehabilitation Project
Job Description: This project generally includes minor and major reconstruction of nineteen (19) City street rights-of-way.
Jaybird Lane Sewer Line Replacement Project
Job Description: This project includes replacing 126 LF of 6” VCP and 55 LF of 8” AC with 8” PVC; replace an existing cleanout with a manhole; pavement within the City limit shall be a T-cut. Approximately 10 feet of pavement within the County Limit requires a full width pavement.
Provide Planning & Engineering Services for the Preparation of the Local Roadway Safety Plan (LRSP)
Job Description: The City is seeking proposal from Engineering and Planning consultants to prepare the City’s Local Roadway Safety Plan (LRSP). Preparation of the LRSP is funded through a grant from the California Department of Transportation (Caltrans) and shall be prepared to their specification.