00 11 16 – NOTICE INVITING BIDS

RATHBUN CREEK PHASE 1A BRIDGE INSTALLATION PROJECT

The Rathbun Creek Phase 1A Bridge Installation Project includes the construction of two concrete bridge abutments supported on 20 foot deep by 24 inch diameter cast in place concrete piles. The work shall also include all bolts, rebar and attachments necessary for securing a pre manufactured 25,000 pound pedestrian bridge that is 64 feet in total length and 14 feet in total width. The Bridge shall be delivered to the job site by the bridge manufacturer. The work shall include lifting the bridge from the delivery truck and placing it onto the foundations. Work shall also include flat work concrete at each side of the bridge.

It is the intention of the Owner to install improvements as shown and set forth on the plans, profiles and detailed drawings and in the particular locations shown upon the drawings. All of the above-mentioned work is particularly set forth in the plans and profiles and these specifications.

The said improvement shall also include all materials, connections and appurtenances, and all work must be installed in place according to these plans and specifications. All costs and expenses of any kind or nature shall be borne by the Contractor. The Contractor shall restore all areas and objects that were damaged or disrupted due to construction activities to a condition as good as existing prior to construction.

enarzh-CNfrdeitkoesvi

Search Our Site